23 05 23 Request for Proposal (RFP)Oulu Pioneer Road Slope Repair

  • May 23, 2023
  • 2 min read

Notice of Invitation: The Town of Oulu is inviting contractors to submit a proposal to repair a slope on Oulu Pioneer Road.


Project Scope: Repair slope near the culvert on Reefer Creek according to engineering sketch provided. Approximately

  1. Contractor to verify height of repair and number of 2’ lifts required as well as horizontal extents of failure.

  2. Excavation to follow excavation line in a stepping format beginning at the toe of failure.

  3. First Lift: Notch out 12” below toe of failure. Length of notch to be 10’ Fill with 12” Select Crushed Material to create stable platform. Lay geo-grid. Add 2’ Select Crushed Material.

  4. Cut second lift area. Lay geogrid all the way across second lift and overtop Select Crushed Material. Fill with 2’ Select Granular Borrow or pit Run Gravel (Typical).

  5. Cut third lift area. Lay geogrid all the way across third lift and top of second lift. Fill with 2’ Select Granular Borrow or Pit Run Gravel (Typical).

  6. Repeat until 6” from top road. Final layer to be 6” gravel.

  7. Layer repaired slope with 4” topsoil, EMAT and seed.


Estimate must include mobilization, equipment, labor and materials to complete the project.


**NOTE: Geogrid is supplied by township**


Please indicate in your bid the earliest this project could be completed.


Certificate of Insurance required


Please mail Oulu Pioneer Road Slope Repair proposals to Diana Reijo, Clerk, 71530 Hoover Line Road, Iron River, WI 54847 or email at townofoulu@gmail.com. Deadline for proposals is Friday, June 2, 2023, 4:00pm. Proposals will be discussed / awarded at the Special Town Board meeting on Saturday, June 3, 2023, 8am at the Oulu Town Hall.

The town reserves the right to accept or reject any or all of the proposals or part thereof as determined to be most advantageous to the town.


Diana Reijo, Clerk

Town of Oulu


Notice Posted: May 23,2023 Town Hall & Town Web Site: ouluwisconsin.com

BY: Diana Reijo, Clerk


Recent Posts

See All
Airport Road Update 6 19 26

Airport Road construction has been delayed for a week or two due to delays on another project the primary contractor is involved with. These were unforeseen circumstances. Once those issues have been

 
 
Notice of Daily Construction Meeting/s

A Daily Construction Meeting will be held virtually on weekdays, beginning June 3, 2026,from 8am – 8:30am for updates on the LRIP Airport Road Construction Project. These meetings will be held throug

 
 
26 Open Books & Board of Review Notice

NOTICE IS HEREBY GIVEN that the Assessment Roll for the Year 2026 assessment for the Town of Oulu, Bayfield County, will be available for examination on June 15, 2026, from 5-7pm at the Oulu Town Hall

 
 

© 2025

Employment (coming soon)

Address

2525 W Colby Rd

Brule, WI 54820

bottom of page